Pre-Qualified
GOV/NON-GOV
Quality Service
#1 in Pakistan
Vast Experience
47+ Years

Canal & Surface Drainage

Unparalleled Workmanship

Construction of Sukhnai Main Drain – II Package – A from RD 380+00 to RD 450+00.

Client: Development Division Sahiwal

Construction of Sukhnai Main Drain – II Package – B from RD 450+00 to RD 530+00.

Client: Development Division Sahiwal

Construction of Sukhnai Main drain – I Package – B From RD 235+00 to RD 300+00 .

Client: Development Division Sahiwal

Construction Sukhnai Main Drain – I Package-C from RD 300+00 to RD 370+00.

Client: Development Division Sahiwal

World Bank assisted Construction of Surface Drains in Fordwah Eastern Sadiqia (South) District Bahawalnagar.

Client: WAPDA

Rehablitating Lower Chennab Canal System (Part -A) Rehabilitating Upper Gogera Branch Cannal RD 0+00 to 54-875 Package -E.

Client: Punjab Irrigation & Drainage Authority

Construction of Sukhnai Main Drain-II Package-A from RD 370+000 to RD 450+000.

Client: I&P Punjab

Construction of Main Drain-II Package-B from RD 450+000 to RD 530+000.

Client: I&P Punjab

Construction of Sukhnai Main Drain-I Package-B from RD 235+000 to RD 300+000.

Client: I&P Punjab

Construction of Sukhnai Drain -I, RD 180+00 to 370+00 (Package -C, RD300-370) .

Client: Punjab Irrigation & Drainage Authority

Construction of M.P. Link Syphon on River Sukhbias.

Client: I&P

Construction of Hasri Drain with relegated Structures.

Client: WAPDA

Rehabilitation of Sukhrawa & Balloki Surface Drainage Systems .

Client: Punjab Irrigation & Drainage Authority

Construction/Excavation of Khairwala Main Drain.

Client: C&W

Remodeling of Lower Bari Doab Canal RD 307 to RD 353.

Client: I&P 

Excavation of Dijkot Drain RD 0 to RD 14000.

Client: C&W